• 00

    days

  • .
  • 00

    hours

  • :
  • 00

    minutes

  • :
  • 00

    seconds

Conference Sessions

February,05 2013

Pre-Forum Training (Electrical Submersible Pumps Worksop)
Co-Chairs: Ahmed Elbehery (General Electric)
Time To No. Topic
08:00 10:30 First Training Session
Ahmed Elbehery (General Electric)
10:30 11:00 Coffee Break
11:00 12:30 Second Training Session
Ahmed Elbehery (General Electric)
12:30 13:30 Lunch
13:30 15:00 Third Training Session
Ahmed Elbehery (General Electric)
14:45 15:00 Certificates Distribution
Ahmed Elbehery (General Electric)
Pre-Forum Training (Sucker Rod Technologies Workshop)
Co-Chairs: Dougles LaBombard (Weatherford)
Time To No. Topic
08:00 10:30 First Training Session
Dougles LaBomberd (Weatherford)
10:30 11:00 Coffee Break
11:00 12:30 Second Training Session
Dougles LaBomberd (Weatherford)
12:30 13:30 Lunch
13:30 15:00 Third Training Session
Dougles LaBomberd (Weatherford)
14:45 15:00 Certificates Distribution
Dougles LaBomberd (Weatherford)
Pre-Forum Training (Artificial Lift Selection Workshop)
Co-Chairs: Suet Bagci (Baker Hughes)
Time To No. Topic
08:00 10:30 First Training Session
Suet Bagci (Baker Hughes)
10:30 11:00 Coffee Break
11:00 12:30 Second Training Session
Suet Bagci (Baker Hughes)
12:30 13:30 Lunch
13:30 15:00 Third Training Session
Suet Bagci (Baker Hughes)
14:45 15:00 Certificates Distribution
Suet Bagci (Baker Hughes)

February,06 2013

Opening Ceremoney
Co-Chairs:
Time To No. Topic
08:40 08:45 Main Partner Welcome Message Mr. Sami Suheil, Chief Operations Officer, vMonitor
08:45 09:15 Keynote Speech (Where the two industries meet;
Dr. Ibrahim Al Rashdan, MD / Kuwait Ministry of Health
09:15 09:30 Opening of the Exhibition
Session I: NEW APPLICATIONS
Co-Chairs: Nasser Salem (ADCO), Khaled Fayoumi (Schlumberger), Osama Fekry (Baker Hughes)
Time To No. Topic
09:30 10:00 MLF00110 From new technology pilots follow up to PCP Services contracts deployment: implementation of a PCP Field Track dedicated software
Pierchon, A. and Robert, B.; PCM
10:00 10:30 MLF00111 Artificial Lift Management System (ALMS)
Al Aswad, H.; Kuwait oil Company
10:30 11:00 MLF00112 Integrated near-online well management—Methodology to maximize production and minimize operating cost in matured brown field
Taylor L.,Sarkar, A., and Lakhwani, M.; Senergy International
11:00 11:30 Coffee Break & Networking Session at the Exhibition Area
Session II: CASE HISTORY
Co-Chairs: Nasser Al Rawahy (Daleel Petroleum), Abdulrahman Fakhroo (Qatar Petroleum),Eissa AL Safran (Kuwait University).
Time To No. Topic
11:30 12:00 MLF00113 Case Study: Advanced Downhole PCP Gauge provides accurate rotor space out in a PCP Well
Cudmore,J, Asfor, W. and Almoosawi, M.; Zenith OilField Technology
12:00 12:30 MLF00114 Improving Production System Reliability through Converting Artificial Lift from Gas Lift to Electrical Submersible Pump
AL-Awaid, A., Khalil M. and A. Bimani; Petroleum Development Oman
12:30 13:00 MLF00115 Hydraulic Jet Pump System Demonstrates Its Suitability for Problem Wells in a Remote Field in the Sultanate of Oman
Nuñez Pino O., Shuelly, M., Stephen, B. and Pugh T.; Weatherford International
13:00 14:00 Lunch & Prayer
14:00 15:00 PANEL SESSION
Artificial Lift in Petroleum Development Oman: Past, Present & Future
Session III: ALTERNATIVE DEPLOYMENT / SURVEILLANCE
Co-Chairs: Abdullah Al Somali (Saudi Aramco), Mohammed Al Shaikh (Occidental), Yanni Wahba (SERCEL– GRC CORP)
Time To No. Topic
15:00 15:30 MLF00116 Dual ESP as Solution for Cross-flow Challenges. Case Study, Well A-06, Muglad Basin, Sudan
Fadl, A., Osman, Y., Abdelrahman, H.; Greater Nile Petroleum Operating Company (GNPOC)
15:30 16:00 MLF00117 How Real-Time Surveillance Improves the ESP Run Life, Uptime and Reduces Production Deferment
Fayoumi K., Elsherif, M., Eraky, M., Matar, H., Hashim, S., Aziz, A., Elbarkatawy, A.; Schlumberger
16:00 16:30 MLF00118 Hydraulic Regulated Progressive Cavity Pump (HR-PCP) for high GVF applications
Benamara, A. and Pierchon, A.; PCM
16:30 17:00 Coffee Break & Networking Session at the Exhibition Area

February,07 2013

Session IV: SELECTION & OPTIMIZATION
Co-Chairs: Tarek Elsonbaty (ADCO), Ion Tanasescu (Weatherford), Ahmad Shoukry (Weatherford), Ahmed Elbehery (GE, Oil & Gas)
Time To No. Topic
08:00 08:30 MLF00119 PCP Close Loop Optimization
Al Mahrooqi, S.; Petroleum Development Oman
08:30 09:00 MLF00120 Artificial Lift Method Selection and Optimization for Kuwait Oil Fields
Mohammad, H.; Kuwait University/Schlumberger, Al-Safran, E., and Al-Jasmi, A.; Kuwait Oil Company
09:00 09:30 MLF00121 Gas Lift Surface Model Sensitivities - Economical Subsurface Optimization Approach
Al Zadjali, A. Occidental of Oman
09:30 10:00 MLF00122 ALES: KOC Artificial Lift Expert System
Al Maqseed, N. , Montoya, C. and Caicedo, S.; Kuwait Oil Company
10:00 10:30 Coffee Break & Networking Session at the Exhibition Area
Session V: NEW TECHNOLOGY & HEAVY OIL
Co-Chairs: Atika Bimani (PDO), Fahad Al Yami (Saudi Aramco), Ibrahim Kamel (Fawares Petroleum Services), Mohamed Ghareeb (Lufkin)
Time To No. Topic
10:30 11:00 MLF00123 New ESP Gauge technology that operates with cable ground faults
David Shanks, Julian Cudmore; Zenith Oilfield Technology
11:00 11:30 MLF00124 Evaluation of All Metal PCP in KOC Heavy Oil Reservoir
Al-Besairi, G.; Kuwait Oil Company, and Bakhtiari, R.; PCM Oil & Gas
11:30 12:00 MLF00125 Pilot of ‘Poseidon Technology’ with ESP for High GOR Wells in KOC
Prasanna Vasant Mali, Ahmad Al Jasmi - (Kuwait Oil Company)
12:00 12:30 MLF00126 Slugging Effect on Artificial Lift Systems in Heavy Oil Horizontal Wells
Zerai, M., Al-Safran, E.; Kuwait University, and Al Jasmi, A.; Kuwait oil Company
12:30 13:30 Lunch & Prayer
13:30 14:30 PANEL SESSION
Artificial Lift in Kuwait Oil Company: Past, Present & Future
Session VI: POWER MANAGEMENT & ECONOMICS
Co-Chairs: Basim Al Rowaih (Kuwait Gulf Oil Company), Mahdy Kotb (Artificial Lift Company, Reza Bakhtiari (PCM Oil & Gas)
Time To No. Topic
14:30 15:00 MLF00127 OPEX Reduction in Wells Pumped by ESPs
Molotkov, R.; Weatherford
15:00 15:30 MLF00128 Energy Efficient Power Distribution System for Artificial Lifting in Kuwait Oil Company
Pattnaik, D. and Al Zalzalah, F.; Kuwait Oil Company
15:30 16:00 MLF00129 Power Efficient ESP
Mollaev, A.; Novomet Group of Companies
16:00 16:30 Forum Closing Remarks and Gift Distribution
Saeed Al Shaheen